Activities

Repair of existing visible leak /Rusted/damaged water supply

Repair of existing visible leak /Rusted/damaged water supply network of G.I. pipelines of 21 UC’s of Municipal Corporation Peshawar

The objectives of this project are to repair /replace the visible leaking water supply pipelines causing contamination and to improve and rehabilitate existing infrastructures of water sully system at 25 Union councils of Peshawar. This will improve the health and living conditions and address priority needs identified by the citizen of Peshawar.

The repair and replacement of leaked / rusted and old pipes was not included in the scope of work of MSP. But on the request of the MCP, special approval of the USAID was taken.

In this project, the repair of visible leak /Rusted/damaged water supply network of GI Pipes, will include:

  1. G.I. pipe : 1.5" i/d
  2. GI Pipe : 2" i/d
  3. GI Pipe : 3" i/d
  4. GI Pipe : 4" Dia
  5. GI Pipe : 6" Dia

The Repair work will include existing visible water supply network of G.I. pipelines reported leak /Rusted/damaged and replacement of old leaking pipelines passing through the open drains causing contamination. The existing old leaking pipelines will be replaced with G.I pipe of medium class pipes as per site conditions.

 

Physical progress and area for ongoing work:

SNO

Proposed Work (Meter)

Work Done (Meter)

%age progress

Remarks.

1

25151

25151

100%

Package WS-02 Compeleted

 

 

 